SUTTER HEALTH Construction Office
- 
   1Sutter_Health_Construction_Office_1The new light wall organizes the three underfinished areas of the historic interior. 
- 
   Sutter Health Award 2024.jpg
- 
   1Sutter_Health_Construction_Office_2Changing details along the circulation spine. 
- 
   1Sutter_Health_Construction_Office_9The existing bearing walls between the three sections could not be removed. The illuminated wall organizes the circulation between the sections. 
- 
   1Sutter_Health_Construction_Office_6Activity tabel in the construction management portion of the space. 
- 
   1Sutter_Health_Construction_Office_5Architectural model illustration the illuminated wall passing through the three difference sections. 
- 
  ![Herman Miller Furniture detail at the sliding green gate to the conference rooom. 1Sutter_Health_Construction_Office_8]() 1Sutter_Health_Construction_Office_8Herman Miller Furniture detail at the sliding green gate to the conference rooom. 
- 
  ![The conference room is in the state of construction. 1Sutter_Health_Construction_Office_3]() 1Sutter_Health_Construction_Office_3The conference room is in the state of construction. 
- 
  ![Detail of retained evidence of prior constructions. 1Sutter_Health_Construction_Office_7]() 1Sutter_Health_Construction_Office_7Detail of retained evidence of prior constructions. 
- 
  ![The finish carpenter assemble the illuminated wall that was prefabricated off-site. 1Sutter_Health_Construction_Office_10]() 1Sutter_Health_Construction_Office_10The finish carpenter assemble the illuminated wall that was prefabricated off-site. 




